1. Water reducing agent on the belt: water reducing agent is a kind of concrete additive which can reduce the water amount of mixing under the condition of maintaining the concrete slump unchanged. It can be carried with the vehicle, which can adjust the concrete well.
2、回厂检查罐内水量:每次出车任务完成回到站内的时候,检查储水罐内的水量,让水罐中的水随时处于满罐的状态,以备不时之需。
2. Check the water quantity in the tank: when the task of leaving the train is completed and returned to the station, check the water quantity in the water storage tank, so that the water in the tank is in full condition at any time, in case of any time.
3、离厂前检查混凝土质量:可能会因为原料的不同,每一盘混凝土质量都会有变化。
3. Check the quality of concrete before leaving the factory: it may change the quality of each plate of concrete due to the different raw materials.
4、减少车辆行驶时间:混凝土运距一般在直径30千米范围以内,出车之前规划好路线以及车辆通行情况。
4. Reduce vehicle driving time: the concrete transportation distance is generally within 30 km in diameter. Route and vehicle traffic conditions are planned before leaving the train.
5、减少损失先卸料:如果遇到人为因素或者不可抗因素,导致长时间无法卸料的情况,一旦发现混凝土开始凝结,在报备负搅拌责自动上料混凝土搅拌车防止粘罐的方法人之后立刻进行卸料,以防整个罐体报废。卸料前让搅拌罐全速运转一两分钟。让混凝土充分搅拌,必要时可以加一些水,让混凝土搅拌得更均匀,也方便卸料。卸料不要大意和放料工打好关系。放料时尽量自己看着,免得放料工乱操作放料操作杆,每次罐子正反转中间位子时尽量停一下,保护减速机,托轮等。与放料工打好关系,卸料时也不要睡的太熟,万一工人闹情绪,把你车子放到工地不转罐子,造成闷罐就麻烦了。
5. Unloading first to reduce losses: if the artificial factors or irresistible factors are encountered, which causes the material can not be unloaded for a long time, once the concrete starts to set, the unloading shall be carried out immediately after the person reporting the method of automatic feeding mixer with the responsibility of mixing to prevent the tank sticking, so as to prevent the whole tank from being scrapped. Allow the mixing tank to run at full speed for a minute or two before unloading. Let the concrete be fully mixed, and add some water if necessary to make the concrete mix more evenly and facilitate unloading. Do not take the unloading effort to make a good relationship with the discharging workers. When discharging, try to watch it yourself, so as not to operate the discharge lever randomly. Stop the middle position as much as possible when the tank is turning the middle position to protect the reducer, supporting wheel, etc. It is necessary to have a good relationship with the discharging workers. Do not sleep too well when unloading. In case of any trouble, put your car on the site without turning the cans, causing trouble with the stuffy cans.
6、搅拌罐一定要仔细地冲洗干净。洗罐子时一定要仔细的冲洗干净,并把水反复的正反转两次,再放出来,然后一趟时把水箱的水全部放进罐子,再回到站加水清洗罐子。
6. The mixing tank must be carefully washed. When washing the tank, it is necessary to carefully wash it, and turn the water back and forth twice, then put it out. Then, put all the water in the tank at one time, and then go back to the station and add water to clean the tank.
今天的精彩内容由搅拌机价格提供,真诚为您提供满意的服务,如果您有疑问或者是问题请欢迎来电咨询,或者是进入我们的网址:http://www.jufengjiaobanji.com
Today's wonderful content is provided by the price of China Science mixer. We sincerely provide you with satisfactory service. If you have any questions or questions, please contact us or enter our website: http://www.jufengjiaobanji.com