一、随车带上一些备用的减水剂
1、 Take some spare water reducing agent with the vehicle
减水剂是一种在维持混凝土坍落度不变的条件下,能减少拌合用水量的混凝土外加剂,随车携带,能对混凝土进行很好的调节。不过在加入减水剂的时候,一定要记得有商砼站化验室的人在场,否则混凝土质量强度不够,后果会很严重。
Water reducing agent is a kind of concrete admixture that can reduce the mixing water consumption under the condition of maintaining the constant concrete slump. It is carried with the vehicle and can adjust the concrete well. However, when adding water reducing agent, be sure to remember that there are people in the laboratory of the commercial concrete station, otherwise the concrete quality and strength are not enough, and the consequences will be very serious.
二、回站检查储水罐内的水量
2、 Return to the station to check the water volume in the water storage tank
每次出车卸完料回到站内的时候,检查储水罐内的水量,确保让水罐中的水随时处于满罐的状态,以备不时之需。自上料搅拌车
Every time when the vehicle is unloaded and returns to the station, the water volume in the water storage tank shall be checked to ensure that the water in the tank is always full for emergency. Self feeding mixer truck
三、离站前检查混凝土质量
3、 Check the concrete quality before leaving the station
可能会因为原料的不同,每一车混凝土质量都会有变化。在装好混凝土离场时,一定要检查罐内混凝土的塌落度以及和易度,小心混凝土的提前凝结和混凝土离析沉淀。
The quality of each truck of concrete may change due to different raw materials. When the concrete is loaded and leaving the site, the slump and workability of the concrete in the tank must be checked, and care must be taken for the early setting and segregation of the concrete.
四、尽量减少车辆行驶的时间
4、 Minimize the time the vehicle travels
混凝土运输距离一般在半径20公里范围以内,出车之前规划好行车路线以及车辆性能情况,尽量减少车辆在路上的行驶时间。自上料搅拌车
The concrete transportation distance is generally within the radius of 20km. Before driving, the driving route and vehicle performance shall be planned to minimize the driving time of vehicles on the road. Self feeding mixer truck
五、特殊情况为了减少损失先卸料
5、 Under special circumstances, discharge materials first to reduce losses
如果遇人为或不可抗因素,导致长时间无法卸料的情况,应随时查看罐内混凝土情况,一旦发现混凝土开始凝结。应立刻进行卸料,以防整个罐体凝罐报废。
If it is impossible to unload materials for a long time due to man-made or irresistible factors, the concrete in the tank shall be checked at any time. Once it is found that the concrete starts to set. Unloading shall be carried out immediately to prevent the whole tank from being scrapped.